PROJECT
ARCHIVE.
From multi-storey structural frames to high-end architectural staircases—this is where precision meets the skyline.
Waterfront Plaza Phase 1
"120-tonne structural steel skeleton for a premier commercial development. Fabricated in-house and fitted on-site ahead of schedule."
The Industrial Hub B1
"Precision-engineered portal frame for a 50,000 sq ft logistics centre. Complete supply and expert site fitting."
Princes Street Retail Hub
"Integrated mezzanine floor and feature feature staircase. Where structural integrity meets high-end retail design."
The Colinton Residence
"Rapid supply and safe installation of multiple 12m RSJs for a high-end residential open-plan conversion."
Livingston Tech Park Phase 2
"Custom steel components and structural reinforcements for a critical infrastructure data centre."
Port of Leith Reinforcement
"Fabrication of heavy-duty structural reinforcements for maritime logistical infrastructure."
TENDER FOR
SUCCESS.
Stop waiting weeks for a callback. Upload your project drawings now for a same-day technical consultation and quote.